Dlp-D6 Remove Sfp Connectors From G1000-2 Cards; Ntp-B219 Remove And Replace A Card - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 1
Install Hardware
Remove the SFP from its protective packaging.
Step 1
Check the label to verify that the SFP is the correct type (SX or LX) for your network.
Step 2
Verify that you are installing compatible SFPs; for example, SX to SX, LX to LX. SFPs must be matched
Step 3
on either end by type.
Plug the duplex connector of the fiber into a Cisco-supported SFP connector. If the new SFP connector
Step 4
has a latch, close the latch over the cable to secure it.
Plug the cabled SFP connector into the G1000-2 card port until it clicks.
Step 5
Step 6
Return to your originating procedure (NTP).

DLP-D6 Remove SFP Connectors from G1000-2 Cards

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Disconnect the network fiber cable from the SFP duplex connector. If the SFP connector has a latch
Step 1
securing the fiber cable, pull it upward to release the cable.
Warning
Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into
beams or view directly with optical instruments.
Pull the fiber cable straight out of the connector.
Step 2
Unplug the SFP connector and fiber from the G1000-2 card.
Step 3
Slide the SFP out of the Gigabit Ethernet card slot.
Step 4
Return to your originating procedure (NTP).
Step 5

NTP-B219 Remove and Replace a Card

Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
March 2003
This task removes SFPs from your Ethernet cards.
None
DLP-D4 Install SFP Connectors on G1000-2 Cards, page 1-24
As needed
Onsite
None
This procedure describes how to remove and replace cards in the
ONS 15327 shelf.
None
As needed
NTP-B219 Remove and Replace a Card
Cisco ONS 15327 Procedure Guide, R4.0
1-25

Advertisement

Table of Contents
loading

Table of Contents