Ntp-B135 Test Electrical Circuits - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 5
Create Circuits and VT Tunnels
c.
d.
e.
If you selected Review Route Before Creation:
Step 14
a.
b.
c.
Step 15
Click Finish. The Circuits window displays.
Verify that the VAP you just created appears in the circuits list. VAPs are identified in the Type column.
Step 16
Stop. You have completed this procedure.

NTP-B135 Test Electrical Circuits

Purpose
Tools/Equipment
Prerequisite Procedures This procedure assumes you completed a facility loopback tests on the
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
the circuit(s). If you are already logged in, continue with Step 2.
From the View menu choose Go to Network View.
Step 2
Click the Circuit tab.
Step 3
March 2003
Click Include to include the node or span in the VAP. Click Exclude to exclude the node or span
from the VAP. The sequence in which you choose the nodes and spans sets the VAP sequence. Click
spans twice to change the circuit direction.
Repeat Step
c
for each node or span you wish to include or exclude.
Review the VAP route. To change the tunnel routing order, choose a node in the Required
Nodes/Lines or Excluded Notes Links lists, then click the Up or Down buttons to change the tunnel
routing order. Click Remove to remove a node or span.
Click Next.
Review the tunnel route. To add or delete a tunnel span, choose a node on the tunnel route. Blue
arrows show the tunnel route. Green arrows indicate spans that you can add. Click a span arrowhead,
then click Include to include the span or Remove to remove the span.
If the provisioned tunnel does not reflect the routing and configuration you want, click Back to
verify and change tunnel information.
This procedure tests DS-1 and DS-3 circuits.
A test set and all appropriate cables
fibers and cables from the source and destination ONS 15327s to the DSX,
and that you created a circuit using one of the following procedures:
NTP-B181 Create an Automatically Routed DS-1 Circuit, page 5-5
NTP-B182 Create a Manually Routed DS-1 Circuit, page 5-10
NTP-B183 Create a Unidirectional DS-1 Circuit with Multiple Drops, page
5-13
NTP-B184 Create an Automatically Routed DS-3 Circuit, page 5-18
NTP-B185 Create a Manually Routed DS-3 Circuit, page 5-22
NTP-B186 Create a Unidirectional DS-3 Circuit with Multiple Drops, page
5-24
Required
Onsite
Provisioning or higher
"DLP-B60 Log into CTC" task on page 2-23
NTP-B135 Test Electrical Circuits
at a node on the network where you created
Cisco ONS 15327 Procedure Guide, R4.0
5-37