NTP-B24 Verify Card Installation

NTP-B24 Verify Card Installation
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Verify that two XTC are installed.
Step 1
Verify that the green ACT (active) LED is illuminated on one XTC and the amber STBY (standby) LED
Step 2
is illuminated on the second XTC.
Note
Verify that OC-N cards (OC-3, OC-12, and OC-48) and Ethernet cards (E10/100 and G1000-2), if
Step 3
required, are installed in the slots designated by your site plan.
Verify that all installed OC-N and Ethernet cards display a solid green ACT LED.
Step 4
Verify that fiber-optic cables are installed and connected to the locations indicated in the site plan. If the
Step 5
fiber-optic cables are not installed, complete the
page
Step 6
Verify that fiber is routed correctly in the shelf assembly. If the fiber is not routed on the shelf assembly,
complete the
Step 7
Continue with the
page
Stop. You have completed this procedure.
Cisco ONS 15327 Procedure Guide, R4.0
3-2
This procedure verifies that the ONS 15327 node is ready for turn up.
An engineering work order, site plan, or other document specifying the
ONS 15327 card installation
Chapter 1, "Install Hardware"
Required
Onsite
Retrieve or higher
If the XTCs are not installed, or their LEDs are not illuminated as described, do not proceed.
Repeat the
"NTP-B217 Install the XTCs" procedure on page
15327 Troubleshooting Guide to resolve installation problems before proceeding to
1-40.
"DLP-B46 Route Fiber-Optic Cables" task on page
"NTP-B25 Set Up Name, Date, Time, and Contact Information" procedure on
3-5.
1-21, or refer to the Cisco ONS
"NTP-B221 Install Optical Cables" procedure on
1-47.
Chapter 3
Turn Up Node
Step
3.
March 2003

Advertisement

Table of Contents
loading

Table of Contents