Cisco ONS 15327 Procedure Manual page 175

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 5
Create Circuits and VT Tunnels
None—Choose this option if you do not want to create a VT tunnel or a VAP. This will be the only
available option if CTC cannot create a VT tunnel or VAP.
If you chose VT Aggregation Point, complete the following substeps. If not, continue with
Step 15
Click Next.
a.
On the VT Aggregation Point Destination panel, click the node that you want to be the VAP
b.
destination, then click Add Destination.
If you selected Review Route Before Creation in
Step 16
continue with
Click Next.
a.
Review the circuit route. To add or delete a circuit span, choose a node on the circuit route. Blue
b.
arrows show the circuit route. Green arrows indicate spans that you can add. Click a span arrowhead,
then click Include to include the span or Remove to remove the span.
If the provisioned circuit does not reflect the routing and configuration you want, click Back to
c.
verify and change circuit information. If the circuit needs to be routed to a different path, see the
"NTP-B182 Create a Manually Routed DS-1 Circuit" procedure on page
Click Finish. One of the following results occurs, depending on the circuit properties you chose in the
Step 17
Circuit Creation dialog box:
If you entered more than 1 in the Number of Circuits field and selected Auto-ranged, CTC
automatically creates the number of circuits entered in the Number of Circuits field. If auto ranging
cannot complete all the circuits, for example, because sequential ports are unavailable at the source
or destination, a dialog box appears. Set the new source or destination for the remaining circuits,
then click Finish to continue auto ranging.
If you entered more than 1 in the Number of Circuits field and did not choose Auto-ranged, the
Circuit Creation dialog box appears for you to create the remaining circuits. Repeat this procedure
for each additional circuit.
After completing the circuit(s), CTC displays the Circuits window.
On the Circuits window, verify that the new circuit(s) appear in the circuits list.
Step 18
Complete the
Step 19
test circuit.
Stop. You have completed this procedure.
March 2003
Use destination as the STS grooming end—Creates the VAP on the DS-1 circuit destination
node. This option is available only if the DS-1 circuit terminates on an OC-N card.
Step
17.
"NTP-B135 Test Electrical Circuits" procedure on page
NTP-B181 Create an Automatically Routed DS-1 Circuit
Step
9, complete the following substeps. If not,
5-37. Skip this step if you built a
Cisco ONS 15327 Procedure Guide, R4.0
Step
16.
5-10.
5-9

Advertisement

Table of Contents
loading

Table of Contents