Download Print this page

Test Equipment - Cisco ONS 15454 Procedure Manual

Hide thumbs Also See for ONS 15454:

Advertisement

NTP-A1 Unpack and Inspect the ONS 15454 Shelf Assembly

Test Equipment

NTP-A 1 Unpack and Inspect the ONS 15454 Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
Complete the
Step 2
Continue with the
Step 3
Stop. You have completed this procedure.
DLP-A1 Unpack and Verify the Shelf Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Step 1
When you receive the ONS 15454 system equipment at the installation site, open the top of the box. The
Cisco Systems logo designates the top of the box.
Remove the foam inserts from the box. The box contains the 15454 shelf (wrapped in plastic) and a
Step 2
smaller box of items needed for installation.
To remove the shelf, grasp both rings of the shelf removal strap and slowly lift the shelf out of the box.
Step 3
Open the smaller box of installation materials, and verify that you have all items listed in the
Step 4
Materials" section on page
Cisco ONS 15454 Procedure Guide, R4.0
1-4
Voltmeter
Optical power meter (for use with fiber optics only)
Bit error rate (BER) tester, DS-1 and DS-3
This procedure describes how to unpack the ONS 15454 and verify the
contents.
Pinned hex (Allen) key for front door
Required
Onsite
None
"DLP-A1 Unpack and Verify the Shelf Assembly" task on page
"DLP-A2 Inspect the Shelf Assembly" task on page
"NTP-A2 Install the Shelf Assembly" procedure on page
This task removes the shelf assembly from the package.
None
Required
Onsite
None
1-2.
Chapter 1
Install the Shelf and Backplane Cable
1-4.
1-5.
1-5.
"Included
March 2003

Advertisement

loading