When Assigning Got I/O Signals - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

8.4.9

When assigning GOT I/O signals

Do not use the I/O signals assigned to the PLC CPU in sequence programs, as these signals are used by the GOT system.
When these signals are used, GOT functions cannot be assured.
8.4.10
When connecting to a QCPU (Q mode)
■1. Restrictions in overall cable length to No. of GOTs
The following restrictions apply when 3 of more GOTs are connected:
Number
of GOTs
1
2
3
4
5
■2. When using a Q00JCPU, Q00UJCPU
The bus extension connector box can be connected only to the extension base unit.
(Connecting it to the main base unit is not allowed)
■3. When using a Q00J/Q00UJ/Q00/Q00U/Q01/Q01U/Q02UCPU
When a GOT is bus-connected to a Q00JCPU or Q00UJCPU, number of extension stages including the GOT must be
2 or less.
When a GOT is bus-connected to a Q00CPU, Q00UCPU, Q01CPU, Q01UCPU or Q02UCPU, number of extension
stages including the GOT must be 4 or less.
8 - 42
8.4 Precautions
Overall Cable Length
Less than 25m
Less than 20m
Less than 15m
Q00JCPU,
Q00UJCPU
Main base unit
Q00JCPU, Q00UJCPU
Extension base unit
Extension
stage 1
Stage No. setting
connector
GOT
Stage No. :2
Restriction
Overall Cable Length
(No restrictions)
(No restrictions)
Main base unit
Q00CPU, Q00UCPU, Q01CPU,
Q01UCPU, Q02UCPU
Extension base unit
GOT
Stage No. :4
25 to 37m
Use the same power supply for the
PLC and all GOTs, and turn these
20 to 37m
devices ON and OFF
simultaneously.
15 to 37m
Extension
stage 1
Extension
stage 2
Extension
stage 3
Stage No. setting
connector
Restriction

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents