Mitsubishi Electric GOT2000 Series Connection Manual page 325

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Open settings
FTP settings
Time settings
(b)
Open settings
The setting is required for all the connected GOTs.
Protocol
Open system
(2) [Controller Setting] and [Ethernet] of GT Designer3
POINT
POINT
POINT
(1) [Controller Setting] and [Ethernet] of GT Designer3
(2) Ethernet setting
(a)
Controller setting
GOT Net No.
GOT Station
GOT Standard Ethernet Setting
GOT Communication Port No.
Retry
Startup Time
Timeout Time
Delay Time
(b)
GOT Standard Ethernet Setting
GOT IP Address
Subnet Mask
Item
Item
For [Controller Setting] and [Ethernet] of GT Designer3, refer to the following.
5.3.1 Setting communication interface (Controller Setting)
When connecting Built-in Ethernet port CPU to a GOT, the settings items for the network No.
and station No. do not exist at the PLC side. However, these virtual values must be set on the
GOT side. Therefore, set the network No. and station No.
Set the network No. that is not existed on the network system and any station No..
Item
Item
Set value
(b) Open settings.
(Use default value)
: Necessary
: As necessary
MELSOFT connection
Set value (Use default value)
Set value (Use default value)
192.168.3.18
255.255.255.0
5.4 PLC Side Setting
Setting necessity at
GOT connection
: Not necessary
Set value
UDP
1
1
192.168.3.18
5001
3times
3sec
3sec
0ms
5 - 59
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents