Mitsubishi Electric GOT2000 Series Connection Manual page 631

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(b)
Network Configuration Settings
Rx/RY, RWw/RWr
*1
setting(1)
RWw/RWr setting
Reserved/Error Invalid Station
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
(1) When changing the module parameter
After writing module parameters to the PLC CPU, turn the PLC CPU OFF then back ON
again, or reset the PLC CPU.
(2) GOT station type
Set the GOT as an intelligent device station.
(c)
Routing setting
Up to 238 [Target Station Network No.]s can be set.
However, the same target station network number cannot be set twice or more (multiple times).
Therefore, the one that can access to other station from the request source host GOT is 238 kinds of [Target
Station Network No.]s.
Target Station network No.
Relay Station network No.
Relay Station No.
Item
Rx/RY setting
Station No.1
Station No.1
Item
Set value
Setting necessity at GOT connection
Start
0000H
End
00FFH
Start
00000H
End
00007H
No setting
: Necessary
: As necessary
Range
1 to 239
1 to 239
0 to 120
11.4 PLC Side Setting
: Not necessary
11
11 - 15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents