Cc-Link(Id) Connection To M700Vs/M70V Series - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

17.5.3

CC-Link(ID) connection to M700VS/M70V series

For details of the CC-Link settings of M700VS/M70V series, please contact our company.
17.5.4
Ethernet connection
■1. System configuration
The following shows the example of the system configuration when using the CNC monitor function.
■2. Parameter setting
Set parameters related to Ethernet with MELSEC's peripheral devices in the same way as parameter setting of
MELSEC CPU, and write them on CNC by Personal computer.
(1) Network parameter setting
Set the network parameters by peripheral device and write them on CNC. An example of parameter setting by
GPPW is as follows. Set the first I/O No. as follows according to the expansion slot to which the unit is inserted.
(a)
Unit No.
Slot position
EXT1
EXT2
EXT3
17 - 22
17.5 CNC Side Settings
<CNC-2>
N/W No.
:239
PLC No.
:3
IP address :192.168.1.3
Ethernet (192.168.1.xx)
<CNC-1>
[Communication with GOT]
N/W No.
:239
PLC No.
:2
IP address :192.168.1.2
Start
I/O No.
0200
0280
0300
<GOT>
N/W No.
:1
PLC No.
:1
IP address :192.168.1.1
Mounting position of extension unit
When mounted
When mounted
in EXT1 and EXT2
in EXT1 and EXT3
EXT2
EXT3
EXT1
Unit2
Unit2
Unit1
When mounted
When mounted
in EXT2 and EXT3
in EXT1 only
EXT2
EXT3
Unit1
Unit2 Unit1
When mounted
When mounted
in EXT2 only
in EXT3 only
EXT3
EXT2
Unit1
Unit1
EXT1
Unit1
EXT1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents