Mitsubishi Electric GOT2000 Series Connection Manual page 237

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 1.
Set the screen switching device of the base screen.
Choose [Common]
device GD100 as the base screen switching device.
(Do not use PLC CPU devices for the screen switching device. If used, the Trigger Action operation of the
GOT may be disabled since the device data of the PLC CPU is overwritten by the device value transferred
with the redundant system tracking function)
Step 2.
Set the trigger action.
Make the setting so that the base screen 1 is displayed when the connected PLC CPU is the standby
system (SM1515 is OFF) in the project specified by selecting [Common]
Condition 1 : SM1515 (while OFF)
Operation : GD100=1
Create the trigger action in the project on the Project tab.
[GOT Environmental Setting]
When the SM1515 is OFF, the connected PLC CPU is the standby system.
The screen switches to the base screen 1.
[Screen Switching/Window], and set the internal
[Trigger Action].
4.2 MELSEC Q Series
4
4 - 61