Mitsubishi Electric GOT2000 Series Connection Manual page 253

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 3.
Create a monitor screen.
For MELSECNET/H connection, MELSECNET/10 connection or Ethernet connection: (Common)
In the device setting (network setting) of each object, set Network No. 1 and Station No. 1 of the control
system.
Step 4.
Validate the station number switching function.
On the Basic tab screen specified by selecting [Screen]
Station No.] to validate the station number changing function.
Make this setting for each monitor screen.
Check here.
Step 5.
Change the station number switching device value in the script.
By selecting [Common]
SM1515 status of the current monitor station, and if it is OFF (standby system), changes the station
number switching device value.
Set the trigger type of the script as [Ordinary] or [Sampling(about 3s)].
• Screen script for MELSECNET/H connection and MELSECNET/10 connection:
// If the host station is not a control station, the station number is switched to that of the other station.
if([b:SM1515]==OFF){
if([w:GD100]==1){
[w:GD100]=2;
}else{
[w:GD100]=1;
}
}
Set the created script for each screen on the Screen tab.
[Script]
[Script], create a script for each monitor screen that checks the
[Screen Property], select the item [Switch
4.2 MELSEC Q Series
4
4 - 77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents