Mitsubishi Electric GOT2000 Series Connection Manual page 606

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(b)
Network range assignment
Monitoring time
LB/LW setting(1)
*1
LX/LY setting
Specify I/O master station
Specify reserved station
Supplementary setting
*1
10 - 28
10.4 PLC Side Setting
Item
Station No.1
LB
Station No.2
*1
Station No.1
LW
Station No.2
*1
Be sure to set it to perform the cyclic transmission.
POINT
POINT
POINT
When changing the network parameter
After writing the network parameter to the PLC CPU, operate the PLC CPU ether turning OFF
and then ON or resetting.
Set value
2000
Start
0000H
End
00FFH
Start
0100H
End
01FFH
Start
00000H
End
000FFH
Start
00100H
End
001FFH
No setting
No setting
No setting
(Use default value)
: Necessary
Setting necessity at GOT
connection
: As necessary
: Not necessary

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents