(2) Routing parameter setting
Up to 64 [Transfer Network No.]s can be set.
However, the same transfer network number cannot be set twice or more (multiple times).
Therefore, the one that can access to other station from the request source host GOT is 64 kinds of [Transfer
Network No.]s.
Target network No.
Relay network No.
Relay station No.
(3) Communication confirmation
The RDY LED on the Ethernet module turn on when the module is ready to communicate.
For confirming the communication state, refer to the following.
5 - 76
5.4 PLC Side Setting
Item
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the request source GOT.
For the setting, refer to the following.
5.3.5 Routing parameter setting
5.3.5 ■4. Confirming the communication state of Ethernet module
AJ71QE71N3-T, AJ71QE71N-B5,
AJ71QE71N-B2, AJ71QE71N-T,
AJ71QE71N-B5T, AJ71QE71,
AJ71QE71-B5
RUN
BUF1
BUF2
RDY
BUF3
BSY
BUF4
SW.ERR.
BUF5
COM.ERR.
BUF6
CPU R/W
BUF7
BUF8
TEST
TEST ERR.
1 to 239
1 to 239
0 to 64
A1SJ71QE71N3-T, A1SJ71QE71N-B5,
A1SJ71QE71N-B2, A1SJ71QE71N-T,
A1SJ71QE71N-B5T,A1SJ71QE71-B5,
A1SJ71QE71-B2
RUN
BUF1
RDY
BUF2
BSY
BUF3
SW.ERR.
BUF4
COM.ERR.
BUF5
TEST
BUF6
TEST ERR.
BUF7
CPU R/W
BUF8
Range