Installing End Doors - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 5-11 Installing a skylight magnetic lock
Step 2 Secure the lock magnet to the magnet fixing base using one M4x10 countersunk screw.
Step 3 Secure the magnetic lock to the lock fixing base using one M6x16 screw.
Step 4 Secure the magnetic lock fixing base to the rotating skylight using two M4x12 screws.
----End

5.2 Installing End Doors

Table 5-1
Table 5-1 Pre-installation checklist
No.
1
2
3
4
Issue 01 (2017-07-30)
lists the items to be checked before end door installation.
Check Item
The cabinets are leveled. The height between the cabinet top
and the floor surface is 2000 mm (+3 mm).
The distance between cabinet doors inside the aisle containment is
1200 mm (± 3 mm).
The cabinets in both rows at the ends of a smart module are
placed with a front-backward deviation no greater than 1.5 mm.
The height deviation between the upper surfaces of the floor and
bases is within 3 mm, and no deviation is preferred.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing the Contained Aisles
Result
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant
□ Compliant
□ Incompliant