Figure 4-7 Checking the width between two rows of cabinets
(1) Cabinet door
Step 2 Use a measuring tape to check that the vertical distance between the top of the cabinet and the
floor is 2000 mm (+3 mm) for a 2000 mm high cabinet. Use a level to check that the cabinet
is level.
Do not remove the anchor bolts. Otherwise, rework is required if the cabinet height does
not meet requirements.
Anchor bolt adjustment method: Wrench an anchor bolt clockwise to elevate a cabinet leg,
or wrench an anchor bolt anticlockwise to lower it. The anchor bolts can be adjusted
within a range of 0–8 mm.
Levelness check standard: Ensure that the cabinet is level in width and depth directions
when leveling the cabinet. Put a level at the bottom of the cabinet in width and depth
directions and check that the air bubble is in the middle between the two lines marked on
the glass tube, as shown in
When leveling the cabinet, use a socket wrench, adjustable wrench, and flat-head screwdriver to adjust
the anchor bolts.
Issue 01 (2017-07-30)
Figure
4-8.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Aisle check tool
4 Installing Cabinets