Huawei FusionModule2000 Installation Manual page 255

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure A-42 Routing half-sized PDU2000 cables
Step 3 Remove the rodent-proof mesh from the top of the cabinet, use diagonal pliers to cut openings
that allow cables to run through, and take out the PDU2000 cables through the openings, as
shown by (1), (2), and (3) in
Figure A-43 Taking out PDU2000 cables
Issue 01 (2017-07-30)
Figure
A-43.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A Appendix
246