Cabinet Installation Checklist
No.
1
2
3
4
5
6
7
8
9
Aisle Containment Checklist
No.
1
2
3
Issue 01 (2017-07-30)
C
Check Item
The cabinet layout is consistent with the
equipment room layout diagram.
The height deviation of all cabinets and the depth
deviation of adjacent cabinets are less than 5 mm.
All bolts are tightened, especially the bolts used
for electric connection. Flat washers and spring
washers are installed properly.
The cabinet is clean and free of dust or dirt.
The cabinet is clear and complies with dustproof
requirements.
The paint on the cabinet exterior is intact. If paint
flakes off, repaint that area to avoid corrosion.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
There is no adhesive tape, cable tie, paper scrap, or
packing material around the cabinet.
Check Item
All aisle containment components are installed.
All labels are correct, clear, and complete.
There are no adhesive tape, cable ties, paper, or
packing materials left around the aisle.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installation Verification

C Installation Verification

Check Result
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant
Check Result
□ Compliant □ Incompliant
□ Compliant □ Incompliant
□ Compliant □ Incompliant