Cable Routes Inside An It Cabinet - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Step 4 Lay out the PDU2000 cables on the top of the cabinet and reinstall the rodent-proof mesh, as
shown by (4) in
Step 5 Install the PDU2000 cables for other IT cabinets in the same way.
----End
Follow-up Procedure
Before connecting the power plug of a device to the PDU2000, loosen the locking device on
the PDU2000. After connecting the power plug, tighten the locking device.
A.8 Cable Routes Inside an IT Cabinet
Figure
customer equipment.
Figure A-44 Cable route along a horizontal cable manager
(1) Small cable ring
(3) Customer equipment
Issue 01 (2017-07-30)
The number of cables and holes shown in the figure is for reference only.
Figure
A-43.
Route cables neatly inside the IT cabinet by following instructions in
Signal cables or weak-current cables inside cabinets are sorted by cable managers, cable rings, and
cable trays.
The cable colors shown in figures are for reference only.
A-44,
Figure
A-45, and
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure A-46
show the routes of the cables out from the front of
(2) Cable manager
A Appendix
11.1 System Cabling
Rules.
247

Advertisement

Table of Contents
loading

Table of Contents