FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 8-51 Connecting power connector cables (BOM number: 14190892)
Figure 8-52 Connecting power connector cables (BOM number: 14190242)
Step 3 Secure the pad power connector holder.
1.
2.
Figure 8-53 Securing the pad power connector holder
(1) Door box
Issue 01 (2017-07-30)
Remove the baffle plate from the power connector mounting holes in the door box.
Secure the pad power connector holder to the door box using two M4x12 screw
assemblies.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices