Huawei FusionModule2000 Installation Manual page 41

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 3-21 Installing an expansion bolt
Step 7 Move the base back to the position so that expansion bolts are inserted into mounting holes on
supports. Secure the base to the concrete floor using expansion bolts obtained in
shown in
Figure 3-22 Tightening expansion bolts
Step 8 Secure the base to the adjacent bases using two M8 screws and nuts, as shown in
Figure 3-23 Connecting the base to the adjacent bases
Issue 01 (2017-07-30)
Figure
3-22.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
Step
Figure
6.3, as
3-23.
32

Advertisement

Table of Contents
loading

Table of Contents