Huawei FusionModule2000 Installation Manual page 135

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 8-3 Installing guide rails
1.
2.
3.
Step 2 Place the server on the guide rails and slide it along the guide rails into the cabinet.
Step 3 Align the two mounting ears of the server with the rack rail of the cabinet and tighten the
screws on the mounting ears.
Figure 8-4 Installing the server
Step 4 Connect the server power cables to the PDU2000.
Issue 01 (2017-07-30)
Place the guide rails horizontally at the installation position in the cabinet.
Fix the guide rails using rubber plugs.
In front of the guide rails: If a server is installed using the upper mounting holes,
insert rubber plugs tightly into the holes at the middle. If a server is installed using
mounting holes at the middle, insert rubber plugs tightly into the upper holes.
Behind the guide rails: Insert rubber plugs tightly into the upper mounting holes.
(Optional) To enhance the rigidness and seismic-proof performance of a server, you can
install bolts at the rear of telescopic guide rails.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
126

Advertisement

Table of Contents
loading

Table of Contents