FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 3-1 Base layout (unit: mm)
3.1.1.2 Installing a Cabinet Base
3.1.1.2.1 Assembling a Base
Before installing a base, assemble it first.
Procedure
Step 1 Adjust the base height.
1.
Issue 01 (2017-07-30)
Measure the distance (H) between the concrete floor and the upper surface of the ESD
floor using a ruler and record the value of H, as shown in