Figure 3-5 Using a laser locator for positioning in the two-row cabinet scenario
(1) Cabinet outline
Step 4 Use a right angle to position the end cabinet base, and ensure that the outline of the upper
surface of the base aligns with the cabinet bottom outline on the floor, as shown in
Figure 3-6 Positioning the first base
Step 5 Use the end cabinet base as the reference and place other cabinet bases.
Step 6 Partially install the front and rear pallets on the base, as shown by (1) in
Issue 01 (2017-07-30)
(2) Contained aisle
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
(3) Laser locator