Huawei FusionModule2000 Installation Manual page 77

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 4-14 Securing an adaptive frame
Step 4 Install the rear panel in the same way.
Step 5 Use four M4x10 screw assemblies to secure the top panel to the front and rear panels, as
shown by (1) in
Step 6 Use four M5x10 tapping screws to secure the top panel to the adjacent cabinets, as shown by
(2) in
Do not over-tighten the top panel of the adaptive frame. Otherwise, the top panel will be
uneven.
Issue 01 (2017-07-30)
Figure
4-15.
Figure
4-15.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installing Cabinets
68

Advertisement

Table of Contents
loading

Table of Contents