Installing The Pad Mounting Kit - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Step 4 Route the button cable out of the cable hole in the upper part of the post and then into the
upper frame mounting kit of the end door.
Step 5 Reinstall the side panel for the post, as shown by (4) in
----End

8.8.8 Installing the Pad Mounting Kit

The BOM number of the pad mounting kit is 21242016. Install the pad mounting kit on the
end door hanger marked with R at the PDC.
Figure 8-44 Pad mounting kit
Table 8-2 Pad mounting kit
No.
1
2
3
Issue 01 (2017-07-30)
Name
Pad mounting kit
Baffle plate with the cable
hole in the lower part
Baffle plate with the cable
hole in the middle
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
Figure
8-43.
Description
Provides the position for installing the pad
and access control.
Used for installing the fingerprint and card
reader or the fingerprint and card reader
with a keypad.
Used for installing the card reader with a
keypad or the IC card reader.