Huawei FusionModule2000 Installation Manual page 96

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 5-13 Assembling the front and rear sealing plates
Step 2 Secure the front and rear sealing plates to the cabinet using four M5x10 tapping screws, as
shown by (1) in
Figure 5-14 Securing a sealing plate
Step 3 Place the side sealing plate with the side with dents upward, and snap the side sealing plate
into the front and rear sealing plates, as shown by (2) in
----End
Issue 01 (2017-07-30)
Figure
5-14.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing the Contained Aisles
Figure
5-14.
87