2.
Step 2 Align the holes in the camera base with those in the control skylight, and secure the camera to
the control skylight using three M3 screws.
Issue 01 (2017-07-30)
Figure 8-18 Removing front and inner covers
Gently insert the micro SD card into the SD card slot.
Figure 8-19 Installing an SD card
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices