Step 2 Install the door frame.
1.
2.
3.
Verify that the posts are flush with the cabinet frame.
Issue 01 (2017-07-30)
Figure 5-24 Assembling a door frame
Stand the assembled door frame.
Partially secure (do not fully tighten the fasteners) left and right posts to the skylight
connective plates using four M6 screws, flat washers, and nuts (two at each side), as
shown by (1) in
Figure
5-25.
Secure the bottom of one door post to the cabinet using two M6 screws and square
washers. The door posts on both sides require four screws, as shown by (2) in
5-25.