Procedure
Step 1 Use two M4x10 screw assemblies to secure the guide rail for the smart ETH gateway to the
planned position, as shown in
Step 2 Connect one end of the ground cable available in the smart ETH gateway package to the
ground point at the lower part of the cable trough using one M4 screw, and connect the other
end to the ground point on the side of the smart ETH gateway, as shown in
Step 3 Install the smart ETH gateway to the guide rail, as shown in
1.
2.
3.
----End
Issue 01 (2017-07-30)
When the smart module is 3.9 meters long or less, no multi-functional sensor is deployed in the
network cabinet.
When the smart module is longer than 7.2 m, deploy one multi-functional sensor in the middle of the
micro-module aisle (one more control skylight is deployed). The multi-functional sensor can be
connected to any smart ETH gateway in the middle.
The M4 screw used for connecting the ground cable to the cable trough is available in the cable trough
package.
Align the upper slot of the guide rail for the smart ETH gateway with the upper part of
the guide rail, and pre-mount it onto the guide rail.
Press the lower part of the smart ETH gateway to clamp the ETH gateway onto the guide
rail.
Shake the smart ETH gateway in different directions to ensure that it is reliably installed.
Figure 8-63 Installing a smart ETH gateway
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
8-63.
8 Installing Monitoring Devices
Figure
8-63.
Figure
8-63.
167

Advertisement

Table of Contents
loading

Table of Contents