Installing A Smart Eth Gateway - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
----End

8.9 Installing a Smart ETH Gateway

Prerequisites
Context
Table 8-4 Scenario 1
Scenario
Figure 8-60 Layout of smart ETH gateways in scenario 1
Issue 01 (2017-07-30)
You have prepared a smart ETH gateway and installation accessories such as the guide
rail (delivered with the smart ETH gateway) and screws.
The number of smart ETH gateways to be installed and their installation positions have
been specified.
Components marked in the same background color should be connected to the same smart ETH
gateway.
Rack environment unit not deployed
Module length ≤ 7 m; number of air
conditioners ≤ 4 PCS
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
Rules for Deploying Smart ETH
Gateways
Deploy 1 PCS for each end cabinet in the
smart module, not for other cabinets. A total
of 4 PCS should be deployed, as shown in
Figure
8-60.
165

Advertisement

Table of Contents
loading

Table of Contents