Huawei FusionModule2000 Installation Manual page 103

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
If the hanging kit rubs against the fixing screws in the top panel of the cabinet, remove the
screws in the top panel, and secure the top panel and the hanging kit to the cabinet using
the screws.
Verify that each conversion bracket shown by (2) in
screw.
3.
If the gaps between door boxes are not even, adjust the leveling screws on the hanging kits (as
shown by A and B in
contact with the middle door box.
Issue 01 (2017-07-30)
Facing the aisle, mount the left and right door boxes respectively onto the left and right
hanging kits, verify that they are in close contact with the middle door box, and secure
them to the hanging kits using six M5x10 tapping screws, as shown by (3) in
5-21.
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5-22) to ensure that the left and right door boxes are in close
5 Installing the Contained Aisles
Figure 5-21
is secured by at least one
Figure
94

Advertisement

Table of Contents
loading