4.4 (Optional) Installing a 300 mm Wide Air Conditioner
Adaptive Frame
Context
Procedure
Step 1 (Optional) If the cabinet depth is 1200 mm, use three M4x10 screw assemblies to assemble
the top panel, as shown in
Issue 01 (2017-07-30)
If an odd number of 300 mm wide air conditioners are installed, an adaptive frame
should be installed so that the lengths of the two cabinet rows are the same. The BOM
number of an air conditioner adaptive frame is 21242047.
An adaptive frame consists of a front panel, rear panel (not distinguished), and top panel.
Perform the following steps to install an adaptive frame.