11.1 System Cabling Rules

Attaching Cable Labels
A cable label must be consistent with the corresponding IT cabinet number.
Find the corresponding cable based on the wiring diagram in the cable fitting bag, and attach
the corresponding cable label taken out from the cable fitting bag to both ends of the cable by
wrapping the ends.
Attach the cable labels 20 mm away from the plug except for special circumstances. For
example, a label shall not be attached to the bending part of a cable or attached in some
positions that may affect cable installation. If a label conflicts with a cable tie, attach the label
to the outer side of the cable tie.
Attach labels to both ends of a cable.
Requirements for Neatly Routing and Binding Cables
To route and bind cables in an appealing way, follow these rules:
1.
Issue 01 (2017-07-30)
The cable labels must completely wrap the cable without wrinkles.
Neatly organize exterior cables in a large bundle of cables and prevent cable tangles that
are avoidable, as shown in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
11
Figure
11-1.