Laying Out The Water Detection Cable (Top Pipe Routing) - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)

8.13.2 Laying Out the Water Detection Cable (Top Pipe Routing)

Context
When the air conditioner pipes are routed from the top, water detectors are installed in the
network cabinet and its opposite cabinet, and bound to the rack rail at the rear door using
cable ties. The binding position is 5 U away from the cabinet bottom.
Figure 8-73
Figure 8-73 Laying out a water detection cable (top pipe routing)
(1) ECC800
Do not contact the water detection cable to metal, for this action will cause a false alarm. Take
protective measures when routing a water detection cable.
Procedure
Step 1 Plan the installation position for the fastener of the water detection cable. Ensure that the
water detection cable placed on the fastener is in good contact with the floor.
Issue 01 (2017-07-30)
shows how the water detection cable is laid out.
(2) Network cable
One fastener is provided for a 1 meter long water detection cable.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
(3) Water detector
(4) Water detection cable
175

Advertisement

Table of Contents
loading

Table of Contents