Table Of Contents - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
About This Document .................................................................................................................... ii
1 Installation Preparations ............................................................................................................. 1
1.1 Transportation and Placing Precautions ........................................................................................................................ 1
1.2 Unpacking and Acceptance ........................................................................................................................................... 2
1.3 Installation Environment Requirements ....................................................................................................................... 3
1.4 Site Requirements ......................................................................................................................................................... 5
1.5 Tools and Instruments ................................................................................................................................................... 7
1.6 Tools Delivered with Equipment ................................................................................................................................ 11
1.7 Personnel Requirements ............................................................................................................................................. 14
1.8 Installation Process ..................................................................................................................................................... 14
2 Scenario Description .................................................................................................................. 16
3 Hardware Installation Preparations ........................................................................................ 18
3.1 (Optional) Installing Bases ......................................................................................................................................... 18
3.1.1 Installing Adjustable Bases ...................................................................................................................................... 18
3.1.1.1 Precautions for Installing the Base ....................................................................................................................... 18
3.1.1.2 Installing a Cabinet Base ...................................................................................................................................... 19
3.1.1.2.1 Assembling a Base ............................................................................................................................................. 19
3.1.1.2.2 Positioning Bases ............................................................................................................................................... 21
3.1.1.2.3 Securing Bases ................................................................................................................................................... 23
3.1.2 Installing Fixed-Size Bases ...................................................................................................................................... 25
3.1.2.1 Deploying a 300 mm Wide Air Conditioner Base ................................................................................................ 25
3.1.2.3 Deploying 600 mm Wide Bases for PDCs ............................................................................................................ 28
3.1.2.4 Deploying 800 mm Wide Fixed Bases .................................................................................................................. 30
3.1.2.5 Securing Bases ...................................................................................................................................................... 30
3.2 Preparing for Installing the 21 kW NetCol5000-A Air Conditioner ........................................................................... 33
3.2.1 (Optional) Refrigerant R410A ................................................................................................................................. 33
3.2.2 (Optional) Refrigerant Oil ....................................................................................................................................... 34
3.2.3 (Optional) Oil Trap and Inverted Trap ..................................................................................................................... 34
3.2.4 Humidifier Water Inlet Pipe ..................................................................................................................................... 35
3.2.5 Drainpipe ................................................................................................................................................................. 36
3.2.6 Pipe Support............................................................................................................................................................. 37
Issue 01 (2017-07-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Contents
Contents
iv

Advertisement

Table of Contents
loading

Table of Contents