Installing Monitoring Devices; Device Layout In The Network Cabinet - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)

8.1 Device Layout in the Network Cabinet

There are multiple types of monitoring components. Make installation plans based on the
configurations.
for your reference.
Figure 8-1 Device layout in the network cabinet
Issue 01 (2017-07-30)
8

Installing Monitoring Devices

Figure 8-1
shows the installation positions for some monitoring components
Relocate the cable manager in the rear door position as high as the device to be installed.
Use a flat-head screwdriver to insert floating nuts into the device mounting holes in the rack rails of
the network cabinet. Ensure that the floating nuts on both sides are on the same horizontal line.
Before connecting power cables for the device, use the ground cable delivered with the device to
connect from the device ground point to the cabinet ground point close to the device mounting holes,
as shown in
Figure
8-2. When there is a special grounding requirement and a cabinet ground bar can
be deployed, use the ground cable prepared by the customer to connect from the device ground point
to the cabinet ground bar.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
124

Advertisement

Table of Contents
loading

Table of Contents