FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 4-15 Securing a top panel
----End
4.5 Installing Cabinet Accessories
4.5.1 (Optional) Taking Out PDU2000 Cables and Industrial
Connectors
Prerequisites
PDU2000s are equipped with industrial connectors.
Procedure
Step 1 Remove the rodent-proof mesh on the top of the PDU2000 in a cabinet, and take out the two
PDU2000 industrial connectors from the top.