Sign In
Upload
Manuals
Brands
Huawei Manuals
Network Hardware
IDS2000 Dual-Row Aisle Containment
Huawei IDS2000 Dual-Row Aisle Containment Manuals
Manuals and User Guides for Huawei IDS2000 Dual-Row Aisle Containment. We have
2
Huawei IDS2000 Dual-Row Aisle Containment manuals available for free PDF download: Installation Manual
Huawei IDS2000 Dual-Row Aisle Containment Installation Manual (283 pages)
Split-type Skylight, Old-Version Sliding Door
Brand:
Huawei
| Category:
Network Hardware
| Size: 20.98 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Installation Preparations
9
Tools and Meters
9
Installation Process
11
Installation Scenarios
12
2 Installing Cabinets
14
Removing the Cabinet from the Pallet
14
Placing and Securing Cabinets
17
Installing Adaptive Frames
20
Overview of Adaptive Frames
20
Installing PDU8000 Adaptive Frames
21
Installing Netcol5000-C Enclosure Frames
26
Combining Cabinets
28
Combining Server Cabinets
28
Combining Air Conditioners
29
Installing Cabinet Accessories
36
Installing Cabinet Sealing Plates
36
Removing Rack Power Distribution Unit
37
3 Installation Scenarios in Dual Row Aisle Containment
39
Installation Flowchart
39
Installing Skylights
39
Installing Cabinet Sealing Plates
53
Installing End Doors
54
Installing a Sliding Door
55
Installing a Double Revolving Door (Compatible with Access Control Components)
68
4 Installation Scenarios with Pillars
82
Installation Scenarios
82
Installation Flowchart
84
Installing Sealing Components in the Scenarios with a Column
85
Installing Sealing Plates and Skylight Connective Plates
85
Installing Adjustable Skylight Ceilings
86
Securing Beams to Holder Sides
90
Installing a PC Plate on the Top of the Skylight
90
Installing Side Pressure Plates
92
Installing a Cable Trough Support Plate
93
5 Installing Cable Trays
95
Installing 390 MM High Cable Trays (for 2 M and 2.2 M High Cabinets)
95
Installing 190 MM High Cable Trays (for 2.2 M High Cabinets)
99
Installing Cable Trays in Scenarios with Columns
100
6 Installing Cable Troughs
101
Installing 600 MM Wide Cable Troughs
101
Installing 300 MM Wide Cable Troughs
106
Installing 800 MM Wide Cable Troughs
107
Installing Cable Troughs on the Top of in Row Air Conditioners Inside the Modular Data Center
108
Installing End Panels for Cable Troughs
108
7 Installing the Access Control System
110
Installing Magnetic Locks and Magnets
111
Installing a Card Reader
117
Installing an Access Control Box
120
Installing Switches
123
Optional) Installing the Lighting System
127
Installing Aisle Lights
127
Installing an In-Cabinet Light
131
9 Installing Auxiliary Devices
135
Installing Monitoring Components
135
Installing the RH2288
135
Installing a LAN Switch
138
Installing a CCU Collector
139
Installing an ECC Collector
142
Installing an NVR
143
Installing and Connecting Monitoring Components
143
Installing a Camera
145
Installing a Smoke Detector
147
Installing a WS302M2A-5 Ambient Temperature and Humidity Sensor
148
Installing an Infrared Sensor
150
Installing a WLDS900 Water Sensor
151
Installing the WCON-22Z Skylight Ceiling Controller
154
Installing a WCON-14Z Skylight Controller
155
Installing the Lighting Control Box
156
10 Cable Layout
157
Cable Routing for the Dual-Row Aisle Containment Scenario
157
Installation Positions and Cable Routing for Monitoring Components
160
Connecting Cables to the Double Door Electromagnetic Locks and Emergency Door Release Button
163
Cable Routing for the Cabinet Lighting
166
Cable Routing for the Aisle Lighting System
167
Cable Routing for Skylight Magnetic Locks
170
Routing Power Cables
171
Grounding Cabinets
173
Routing Signal Cables
174
Installing Cables for the Power Supply and Distribution System
175
Connecting Cables to Battery Cabinets
175
Connecting Cables to the Power Supply and Distribution System
198
Connecting Cables to the Temperature Control System
199
Connecting Cables to the Data Center Management System
200
Preparing a Monitoring Cable
200
Port Description for the CCU Collector
203
Port Description for the ECC Collector
210
Connecting a Monitoring Cable to a CCU Collector
212
Connecting a Monitoring Cable to the ECC Collector
213
Connecting a Monitoring Cable to a LAN Switch
214
Connecting a Monitoring Cable to an RH2288
215
Cable Connection for the Neteco
215
Connecting Monitoring Cables to a WCON-22Z Skylight Controller
216
Connecting a Monitoring Cable to a WCON-14Z Skylight Ceiling Controller
219
Connecting a Monitoring Cable to a Camera
222
Connecting a Monitoring Cable to a Door Status Sensor
223
Connecting a Monitoring Cable for the SD-09A-HWA Current-Type Smoke Sensor
224
Connecting a Monitoring Cable to the SDLH-94R Dry Contact-Type Smoke Sensor
225
Connecting a Monitoring Cable to a WS302M2A-5 Ambient Temperature and Humidity Sensor
226
Connecting a Cable to the WLDS900 Water Sensor
227
Connecting Cables to the SJ535A Water Sensor
228
Connecting a Monitoring Cable to a Point Water Sensor
230
Connecting a Monitoring Cable to a Hydrogen Sensor
231
Connecting a Monitoring Cable to an Access Controller in a Modular Data Center
231
Connecting a Monitoring Cable to the MS899 Electronic Door Lock
233
Installing the SMS Modem
235
Connecting Monitoring Cables to a Lighting Control Box
236
Optional) Connecting a Monitoring Cable to an NVR
237
Connecting a Monitoring Cable to an ACRD502 Air Conditioner
238
Connecting a Monitoring Cable to a PEX Air Conditioner
239
Connecting a Monitoring Cable to a CRV Air Conditioner
241
Connecting a Monitoring Cable to a Datamate3000 Air Conditioner (Method One)
242
Connecting a Monitoring Cable to a Datamate3000 Air Conditioner (Method Two)
244
Connecting a Monitoring Cable to a Netcol5000-C025
245
Connecting a Monitoring Cable to a Netcol5000-C030
246
Connecting a Monitoring Cable to a Netcol5000-A
247
Connecting a Monitoring Cable to a Netcol8000-A
247
Connecting a Monitoring Cable to a HIPULSE-NXL UPS
247
Connecting a Monitoring Cable to a HIPULSE U UPS
248
Connecting a Monitoring Cable to a Galaxy7000 UPS
248
Connecting a Monitoring Cable to a Delta 120 Kva UPS
249
Connecting a Monitoring Cable to a Riello UPS
249
Connecting a Monitoring Cable to a UPS2000-G
250
Connecting a Monitoring Cable to a UPS5000-E
250
Connecting a Monitoring Cable to a UPS8000-D
251
Connecting a Monitoring Cable to a YD2010 Coulometer
252
Connecting a Monitoring Cable to a PD800 Coulometer
253
Connecting a Monitoring Cable to a PD510 Coulometer
254
Connecting a Monitoring Cable to a DIRISA20 Coulometer
254
Connecting a Monitoring Cable to an ABB OTM ATS
255
Connecting a Monitoring Cable to a TU520A ATS
256
Connecting a Monitoring Cable to a PDU8000-0250ACV4-SCA005
257
Connecting Cables to the Fire Extinguishing System
258
11 Check after Installation
260
A Appendix
263
Combining Liebert APM UPS Cabinets
263
Installing Skylight Sealing Kits (for Double Doors)
265
Optional) Installing Double-Swing Doors
267
Optional) Connecting Linkage Cables between the Gas Extinguishing Controller and ATS
270
Optional) Connecting Linkage Cables between the Fire Extinguishing System and Access Controller
272
Cable List
273
Advertisement
Huawei IDS2000 Dual-Row Aisle Containment Installation Manual (204 pages)
Intelligent Micro-Modular Data Center 2000 mm High Cabinet in Dual-Row Aisle Containment
Brand:
Huawei
| Category:
Server
| Size: 15.39 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Precautions
9
General Safety Precautions
9
Electrical Safety
10
Battery
12
Mechanical Safety
14
Others
15
2 Installation Preparations
16
Transportation Precautions
16
Unpacking and Acceptance
17
Installation Environment Requirements
17
Site Requirements
19
Documents
21
Tools and Instruments
22
Personnel Requirements
24
3 Scenario
26
4 Hardware Installation
28
Installation Flowchart
28
Positioning Cabinets or Bases
30
Installing Bases
31
Installation Flowchart
31
Placing Bases
32
Deploying a 600 MM Wide Fixed Base
32
Deploying an 800 MM Wide Fixed Base
33
Deploying a 600 MM Wide PDU8000 Base
33
Deploying a 300 MM Wide Fixed Base
35
Securing Bases
35
Routing and Securing Air Conditioner Pipes
38
Requirements of Air Conditioner Pipe Connectors and Water Quality
38
Precautions for Routing and Securing Air Conditioner Pipes
40
Installing the Cabinet
42
Cabinet Installation Flowchart
42
Removing the Pallet from a 2000 MM High Cabinet
42
Placing the Cabinet
43
Securing a Cabinet
44
Securing a PDU8000
44
Securing a Server Cabinet
45
Securing a Netcol5000-A020 Air Conditioner
46
Installing Adaptive Frames
49
Installing the PDU8000 Tail Frame
49
Installing a 300 MM Wide Air Conditioner Adaptive Frame
52
Combining Cabinets
54
Installing Cabinet Accessories
55
Taking out PDU2000 Industrial Connectors and Cables
55
Optional) Installing a Branch Ground Bar
57
Installing the Contained Aisles
58
Installation Flowchart
58
Skylight Overview
58
Installing Skylights
62
Installing End Doors
67
Installing a Sliding Door
68
Installing a Mounting Kit under a Sliding Aisle Door
68
Installing a Sliding Door in the 2000 MM Scenario
71
Installing a Double Revolving Door (Compatible with Access Control Components)
78
Installing Aisle Door Fittings
78
Installing a Door Frame
80
Installing Door Panels
83
Installing a Door Closer
87
Installing Post Side Panels and Removing the Auxiliary Bar
91
Installing Cable Trays
92
Installing Cable Troughs
95
Installing a 600 MM Wide Cable Trough
96
Installing a 300 MM Wide Cable Trough
101
Installing an 800 MM Wide Cable Trough
102
Installing End Panels for Cable Troughs
102
Optional) Installing the Access Control System
103
Installing a Double-Door Magnetic Lock
104
Installing the Card Reader
110
Installing an Access Controller
114
Installing Switches
117
Optional) Installing Aisle Lights
121
Installing Monitoring Devices
123
Device Layout in the Network Cabling Cabinet
123
Installing the Server
125
Installing a LAN Switch
127
Installing an ECC Collector
129
Optional) Installing the VCN500
129
Installing a Skylight Controller
130
Installing the Lighting Control Box
131
Optional) Installing an STS Switch
131
Optional) Installing an Independent AI/DI Module
132
Installing Monitoring Components on a Control Skylight
132
Installing a Camera
134
Installing a Smoke Sensor
137
Installing an Infrared Sensor
138
Installing Temperature Sensors
139
Installing the Audible and Visual Alarm
140
Installing a WLDS900 Water Detector
141
Cable Routing
144
System Cabling Rules
144
Cable Routing for the Dual-Row Aisle Containment Scenario
149
Routing Cables for the Network Cabling Cabinet
150
Installation Positions for Monitoring Components
151
Cable Routing for the Door Monitoring Components
152
Cable Routing for the Sensors on the Control Skylight
153
Cable Routing for the Aisle Lighting System
154
Cable Routes for Skylight Magnetic Locks
156
Connecting Module Ground Cables
157
Cable Installation for the Power Supply and Distribution System
160
Connecting Battery Cables
160
Cable Connections for Power Supply and Distribution Devices
165
Connecting Cables for the Temperature Control System
165
Installing Cables for the Equipment Room Management System
165
Preparing a Monitoring Cable
165
Connecting the Server Monitoring Cable
167
Installing the SMS Modem
167
Connecting the LAN Switch Monitoring Cable
169
Connecting a Monitoring Cable to the ECC Collector
170
Optional) Connecting a Monitoring Cable to the VCN500
170
Connecting a Monitoring Cable to a Lighting Control Box
171
Connecting a Monitoring Cable to the Skylight Controller
173
Connecting an Access Controller Monitoring Cable
175
Connecting a Monitoring Cable to a Camera
178
Connecting a Monitoring Cable to a Door Status Sensor
178
Connecting a Monitoring Cable to a Smoke Sensor
179
Connecting a Cable to the WLDS900 Water Detector
180
Connecting a Cable to a Temperature Sensor
180
Connecting a Monitoring Cable to the MS899 Electronic Lock
181
Connecting a Monitoring Cable to a PDU2000
181
Connecting the Netcol5000-A020 Monitoring Cable
182
Connecting PDU8000 Monitoring Cables
184
Optional) Installing Base Decorative Plates
185
Installing Cabinet Sealing Plates
186
5 Checking the Installation
188
6 Power-On Commissioning
189
Power-On Commissioning Process
189
Commissioning the Power Supply and Distribution System
190
Commissioning the Temperature Control System
190
Configuring the Facility Management System
191
A Appendix
193
Optional) Connecting Linkage Cables between the Gas Extinguishing Controller and ATS
193
Optional) Connecting the Linkage Cables between the Fire Extinguishing System and Access Controller
195
Introduction to ECC Ports
196
Ports on the Skylight Controller
198
B Checking the Installation
201
C Acronyms and Abbreviations
204
Advertisement
Related Products
Huawei iSitePower-M
Huawei IDS1000
Huawei IDS1000-A
Huawei IDEOS
Huawei IdeaShare Key
Huawei IdeaShare
Huawei eSpace IPC 5601
Huawei IPC5602
Huawei IPC6225-VRZ-ES
Huawei INE-LX2r
Huawei Categories
Cell Phone
Network Router
Wireless Router
Modem
Network Hardware
More Huawei Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL