Huawei FusionModule2000 Installation Manual page 48

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Applicatio
n Scenario
Outdoor unit
Issue 01 (2017-07-30)
Name
power
Standby or
cable
without
heating or
humidificati
on
Signal cable to the
outdoor unit (optional)
Power cable to the
outdoor unit (optional)
M4/OT terminals of
outdoor unit power
cable
M6/OT terminals of
outdoor unit power
cable
Cord end terminal of
outdoor unit power
cable
Cord end terminal of
indoor and outdoor
unit communications
cable
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
Technical Specifications
Common Terminal,
Conductor Cross Section 6
2
mm
, Length 20 mm, 30 A,
Insertion Depth 12 mm,
Black
Symmetry Twist Cable, 100
ohm, SFTP CAT5E, 0.53
mm, 24 AWG, 4 Pairs,
Black, Outdoor Cable
Electronic Electric Cable,
600 V/1000 V, ZA-RVV, 5 x
2
2.5 mm
, Black (5Cores:
Red, Yellow, Green, Blue,
Black), 27 A, Outdoor
Cable, CE
Naked Crimping Terminal,
2
OT, 2.5 mm
, M4, Tin
Plating, Insulated Ring
Terminal, 16-14 AWG
Naked Crimping Terminal,
2
OT, 2.5 mm
, M6, Tin
Plating, Insulated Ring
Terminal, 16-14 AWG
Common Terminal, Single
Cord End Terminal,
Conductor Cross Section 2.5
2
mm
, 12.5 A, Insertion
Depth 8 mm, Blue
Common Terminal, Single
Cord End Terminal,
Conductor Cross Section
2
0.25 mm
, Length 12 mm,
Insertion Depth 6 mm, 2 A,
Light blue
Description
The length is
determined by
site survey.
1 PCS
Do not connect
the neutral wire
to the outdoor
unit. The length
is determined by
site survey. The
cross-sectional
area of the cable
should not be
greater than 4
2
mm
.
Delivered with
the accessories
Delivered with
the accessories
Delivered with
the accessories
Delivered with
the accessories
39

Advertisement

Table of Contents
loading

Table of Contents