8.8.8.5 Installing a Pad Power Connector

Prerequisites
Before installing a pad power connector, prepare the materials listed in
Table 8-3 Material list
Name
Pad power connector
Pad power connector
Pad power connector holder
Procedure
Step 1 Assemble the pad power connector holder.
1.
2.
3.
Issue 01 (2017-07-30)
Clamp the power connector to the guide rail of the holder.
Install the holder cover using two M4x12 screw assemblies.
Install the holder baffle plate using one M4x12 screw assembly.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Exterior
8 Installing Monitoring Devices
Table
8-3.
Description
The BOM number is
14190892.
The BOM number is
14190242.
Obtain it from the pad
mounting kit materials
(BOM number: 21242016).
158

Advertisement

Table of Contents
loading

Table of Contents