FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Device Name
PDU2000 (optional)
Integrated UPS
13.3 Commissioning the Cooling System
If the environment outside the module is humid and condensation occurs outside the doors of
the cold aisle containment, adjust the temperature at the air exhaust vent of the air conditioner
or dehumidify the rooms.
To commission a cooling device, follow instructions in the documents delivered with it.
13-2
Table 13-2 Reference documents for the cooling system
Device Name
NetCol5000-A 21 kW air
cooled in-row precision
air conditioner (208 V)
NetCol500 outdoor unit
13.4 Commissioning the Management System
For details about how to operate the devices deployed in the management system, see the
instructions in iManager NetEco Device Commissioning Guide-(NetEco Version) (The
NetEco version depends on the version in use. Click
Issue 01 (2017-07-30)
lists the reference documents.
Set the initial temperature to 20° C and relative humidity to 50% for air conditioners. To adjust the
temperature for air conditioners, follow instructions provided in the documents delivered with the air
conditioners.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Reference
A.7 (Optional) Connecting PDU2000 Cables
UPS5000-E-(20 kVA–80 kVA) Quick Guide (Integrated UPS,
208 V)
The document is delivered with the device, or you can click
Download.
Reference
NetCol5000-A 21 kW Air Cooled In-row Precision Air
Conditioner Quick Guide (208 V)
The document is delivered with the device, or you can click
Download.
NetCol500 Variable Speed Outdoor Unit User Manual
The document is delivered with the device, or you can click
Download.
13 Power-On Commissioning
on the NetEco WebUI to obtain the
Table
211