Huawei FusionModule2000 Installation Manual page 140

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
3.
Step 5 Install the antenna.
1.
2.
(1) 2.4G antenna
3.
Issue 01 (2017-07-30)
Figure 8-12 Installing a SIM card
Reinstall the ECC800 main control module in the ECC800 subrack, and tighten the
captive screws on both sides of the module.
The antenna can be installed using the magnet on its base. Attach the 2.4G antenna
(RF_Z antenna) to the skylight connective plate above the top of the network cabinet in
the aisle containment. (Optional) Attach the 3G antenna to the skylight connective plate
or the network cabinet top plate outside the aisle containment.
Route the 2.4G antenna cable through the cable hole in the skylight plate, through the
rodent-proof mesh and sponge strip on the top of the cabinet, and to the correct port on
the ECC800. (Optional) Route the 3G antenna cable through the rodent-proof mesh and
sponge strip on the top of the cabinet and to the correct port on the ECC800.
Figure 8-13 Installing an antenna
Connect the 2.4G antenna cable to the RF_Z antenna port on the ECC800. (Optional)
Connect the 3G antenna cable to the 3G/4G antenna port on the ECC800.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
(2) 3G antenna
131

Advertisement

Table of Contents
loading

Table of Contents