FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 3-41 Installing the upper sealing plates of a tail frame
Step 3 Open the PDC rear door, and remove it, as shown in
When removing the cabinet rear door, remove the ground cable between the cabinet and the
rear door from the cabinet.
Figure 3-42 Removing the cabinet rear door