FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 8-25 Installing a multi-functional sensor
----End
8.8 (Optional) Installing Monitoring Components on the
End Door

8.8.1 Monitoring Component Layout for the Sliding Door

Figure 8-26 Installation positions for monitoring components on the sliding door
(1) AC actuator
Issue 01 (2017-07-30)
(2) Access actuator
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing Monitoring Devices
(3) Skylight actuator
139