4.1 Installing Cabinets (with Bases)

Prerequisites
The upper surface of the ESD floor is flush with the upper surface of the base.
Procedure
Step 1 Place a cabinet onto the base and adjust the cabinet position to ensure that the mounting holes
in the cabinet and base are aligned with each other.
Step 2 Use a measuring tape to check that the vertical distance between the top of the cabinet and the
floor is 2000 mm (+3 mm) for a 2000 mm high cabinet. Use a level to check that the cabinet
is level.
Issue 01 (2017-07-30)
Do not remove the anchor bolts. Otherwise, rework is required if the cabinet height does
not meet requirements.
Anchor bolt adjustment method: Wrench an anchor bolt clockwise to elevate a cabinet leg,
or wrench an anchor bolt anticlockwise to lower it. The anchor bolts can be adjusted
within a range of 0–8 mm.
Levelness check standard: Ensure that the cabinet is level in width and depth directions
when leveling the cabinet. Put a level at the bottom of the cabinet in width and depth
directions and check that the air bubble is in the middle between the two lines marked on
the glass tube, as shown in
When leveling the cabinet, use a socket wrench, adjustable wrench, and flat-head screwdriver to adjust
the anchor bolts.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4

Installing Cabinets

Figure
4-1.
4 Installing Cabinets
56

Advertisement

Table of Contents
loading

Table of Contents