4.
Step 3 Secure the door panels.
Before securing door panels, measure the door panel size. The door panels should be 2045 mm (± 2 mm)
long and 600.5 mm (± 2 mm) wide.
1.
Issue 01 (2017-07-30)
Figure 5-25 Installing a door frame
Tighten all screws on the door frame.
Stand the door panels and remove the four rubber strips from the two door panels, as
shown in
Figure
5-26.