FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Procedure
Step 1 Assemble cable trays. Place four cable tray supports at the coated positions on the cable trays.
Secure each support to the cable trays using four M8 screws.
Figure A-28 Assembling cable trays
Issue 01 (2017-07-30)
Figure A-27 Layered installation
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A Appendix
235