C Installation Verification - Huawei FusionModule2000 Installation Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Cabinet Installation Checklist
No.
1
2
3
4
5
6
7
8
9
Aisle Containment Checklist
No.
1
2
Issue 02 (2018-03-31)
C
Check That
The cabinets are placed according to the equipment room
layout diagram.
The height deviation of all cabinets and the depth
deviation of adjacent cabinets are less than 5 mm.
All bolts are tightened, especially the bolts used for
electric connection. Flat washers and spring washers are
installed properly.
The cabinet is clean and complies with dustproof
requirements.
The paint on the cabinet exterior is intact. If paint flakes
off, repaint that area to avoid corrosion.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
There is no foreign matter such as adhesive tape, cable
ties, paper, or packing materials left around the cabinet.
The cabinet filler panels are in proper positions so that
the cold aisle and hot aisle are isolated.
Check Item
All components of the aisle containment are installed.
The end doors can be opened and closed smoothly.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Installation Verification

C Installation Verification

Check Result
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
□ Compliant □
Incompliant
Check Result
□ Compliant □
Incompliant
□ Compliant □
305