Table 4-3 Skill requirements for the FusionModule1000 commissioning personnel
Field
Power supply
and distribution
system
Cooling system
Management
system
Fire
extinguishing
system
Lighting and
structural
systems
4.4 Preparing for the Power Supply and Distribution
System Power-On Commissioning
Prerequisites
The FusionModule1000 has been installed and has passed the insulation test.
Preparations
Tools: multimeter, Phillips screwdriver
Documents: power supply and distribution device layout diagram, power supply
and distribution system diagram, power supply and distribution device initial
configuration table
Skill requirement: power distribution engineer
Issue 03 (2022-12-15)
Personnel Skill Requirement
Familiar with the power supply and distribution system
configurations and the operations for each core device in the
FusionModule1000
With power distribution engineer qualifications
Familiar with the cooling system configurations and the
operations for each core device in the FusionModule1000
With cooling engineer qualifications
With knowledge in the hardware and software of the
container data center, familiar with basic communications
protocols, familiar with equipment interfaces in weak-current
systems, and proficient in operating the NetEco
management system
With weak-current engineer qualifications
Familiar with the fire extinguishing system configurations
and the operations for each core device in the
FusionModule1000
With fire protection engineer qualifications
Familiar with the overall configurations and layout of the
FusionModule1000
Experienced in data center maintenance
NO TE
For the diagrams and tables, see the initial configuration parameter manual for the solution
in use.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Preparations for Power-On Commissioning