Cisco ONS 15454 Hardware Installation Manual page 425

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M6 Shelf
Figure 266: ECU module Cable Routing
Figure 267: Cable Management
Step 2
Fix the cables using the tie-wrap provided in the accessories kit.
Step 3
To route the optical patch cords or copper cables, do the following as necessary:
a) Route the optical patch cords from the line cards through the fiber or cable module as shown in the
following figure.
DLP-G655 Route and Lock Cables
Cisco ONS 15454 Hardware Installation Guide
395

Advertisement

Table of Contents
loading

Table of Contents